Infrastructure & Transport • Paraburdoo, WA (Pilbara) • 6 months

Paraburdoo Airport Asphalt Overlay

On-site QA/QC engineering support for a high-stakes asphalt overlay project at an operational airport, delivering zero audit findings and first-submission handover acceptance.

Airport asphalt overlay project

6 months

Duration

Zero

Audit findings

First submission

Handover acceptance

The Challenge

  • High-stakes environment: Operational airport with strict aviation safety and compliance requirements.
  • Regulatory complexity: CASA oversight, MOS 139 compliance, multiple regulatory touchpoints.
  • Quality verification intensity: Every lot required survey verification, test record completion, formal hold-point approval.
  • Coordination: Ongoing liaison with airport operations, contractor teams, multiple approval authorities.
  • Documentation burden: Complete traceability required from design intent through to as-built verification.

MESCo’s Role

MESCo provided on-site QA/QC engineering support through a Site Engineer engaged directly by the principal contractor. The Site Engineer implemented MESCo’s management plans, project procedures, QA/QC frameworks, lot registers, and risk management systems. Daily coordination ensured that procedures were followed, quality criteria were verified, and documentation remained current.

Key Deliverables

  • Project management plans (aligned to CASA/MOS 139 requirements)
  • Customised QA/QC procedures for asphalt overlay and profiling activities
  • Automated lot register management (100+ lots, real-time % complete tracking)
  • ITP coordination and hold-point management (liaison with CASA and principal for approvals)
  • Test record collation and verification (asphalt, profiling, survey data)
  • Daily QA status reporting to principal
  • Non-conformance logging and closure tracking
  • Close-out documentation compilation and handover support

Outcome

  • Zero audit findings on QA/QC documentation.
  • All ITPs closed out on schedule with documented approvals.
  • Master Defect Register completed with zero unresolved items at handover.
  • Handover documentation accepted on first submission (no remedial requests).
  • CASA compliance verified and certified.

Lessons Learned

  • Early involvement in system design accelerates QA/QC execution.
  • Well-designed management plans and procedures prevent rework. Automation of lot registers reduces manual admin and improves data accuracy.
  • Daily reporting to principal builds confidence and surfaces issues early.
  • Clear allocation of approval authority prevents delays. Integration of all systems — plans, procedures, frameworks, registers — ensures nothing falls through the cracks.

Other case studies

See all case studies

Mining & Resources

BHT LME04 Diversion Road Construction

Integrated engineering and HSE support for construction of a temporary MAR bypass at Hope Downs 1, delivering a clean close-out package with all tests passed on first submission.

View project

Hope Downs 1 – Bedded Hilltop (BHT), WA

Infrastructure & Transport

Northern Revetment Wall Rehabilitation

QA/QC, HSE, and environmental compliance systems for the rehabilitation of a 322-metre revetment wall within an active bulk port facility, achieving zero non-conformances at first audit.

View project

North Queensland